Andersons Air Conditioning carried out this installation in the function room at Whitefield Synagogue in Bury. The room has a capacity of up to 250 people. During the summer months the when the room was in use, it was extremely uncomfortable due to the heat. Also, during winter the ex
Andersons’ carried out this installation for Selecta in Trafford Park, Manchester Selecta required 2 air conditioning systems, one was to provide cooling in their new vending sales showroom, due to high number of machines in there and the second system was to provide comfort heating a
Andersons installed a combination of VRF and Twin Split air conditioning and heat pump systems into the offices and labs at the dental laboratory in Bolton. We installed Mitsubishi ceiling cassette units throughout. The customer also had gas central heating system installed at the sam
Andersons carried out a combined installation of heat pumps and air conditioning systems at a college in Manchester. There was 8 split ceiling cassette systems and 1 x twin, split ceiling cassette system installed. The Cages for outdoor units were made by a local fabrication company a
Combined heat pump and air conditioning system installation was completed by Anders AC. The job was completed in Little Leaver in Manchester. The system was installed due to the high running costs of their existing storage heaters.
Andersons installed a Mitsubishi air Conditioning and heat pump system in to the foundry office located in Bolton, Lancashire. The offices had a part glass roofing system which made them extremely warm in Summer and cold in Winter months. The Mitsubishi system we installed cured both
Installation of two, 10 kw, Mitsubishi heating and cooling ceiling cassettes were installed at Sharples High School. The Air conditioning units were installed in the school library and mainly used for cooling due to school kitchens being located directly underneath. Save
Andersons Air Conditioning installed 3 Mitsubishi, 12Kw, high level cassettes providing heating and cooling in the media studio at the Didsbury university campus. The job has escalated into installation of air conditioning units in the classrooms and the film editing / audio rooms wit